Shiraz Metro Line 2

  • Client:
  • Location:
  • Project Status:
  • Year:
Project introduction
  • The 15 Km line 2 is currently under construction and will intersect with Line 1 at “Imam Hossein Square”
  • Line 2 will pass “Aadel Abad” via “Enghelab Street” and “Basij Square”. There will be two separate tunnels, each with 7 m in diameter, at the depth of 15 m. Among the 10 planned stations, there will be 2 above the ground stations
  • Collaboration of Chillco and CITIC Co.
  • Research design for 9.4 km full-construction and 13 stations