The 15 Km line 2 is currently under construction and will intersect with Line 1 at “Imam Hossein Square”
Line 2 will pass “Aadel Abad” via “Enghelab Street” and “Basij Square”. There will be two separate tunnels, each with 7 m in diameter, at the depth of 15 m. Among the 10 planned stations, there will be 2 above the ground stations
Collaboration of Chillco and CITIC Co.
Research design for 9.4 km full-construction and 13 stations